Project Desciption
This is the open-air football stadium of the Royal Gymnasium of the King’s University of Dubai. The stadium has 10,000 square meters. Among them, there are 5,000 square meters of a football field and 316L stainless steel of 400 square meters for the whole stadium. It consists of a variety of 316L gold Bull-nose. Bull-nose is all 3D curved 20m high. Each bull-nose has a different size, and each bull-nose has about 30 large drawings. The entire stadium consists of 300 big bull-nose. There are 600 40HQ containers at the time of shipment. 30 containers per week.
Hatco is the main contractor. Yongsheng completed all the projects in only 5 months and is expected to be completed in 7 months. Yongsheng was 2 months ahead of schedule. After completion, the Hatco project manager greatly appreciated Yongsheng. Gave the gift from the king to Yongsheng. Thank you for Yongsheng cooperation, thank you for Yongsheng good work, good team. Also, write a thank-you note to Yongsheng. When Yongsheng receives the thank-you note, all the hard work is worth it.